dubnut 10 Posted March 27, 2013 anyone in need of above... engines done 148000 was running before removal would be ideal rebuild most parts there...metering head not great but available loom plugs have been cut at fuse box but can be rewired £100 to get it out of my garage Quote Share this post Link to post Share on other sites