Jump to content

dazfxvw

Members
  • Content Count

    166
  • Joined

Everything posted by dazfxvw

  1. I dont know what you mean!!...........Cough.........start my first of 10 days anual leave today...cough :oops: :D
  2. Thanks mate, it was'nt that hard to do either, about 5 hours work in total. Not done the boot or mat's yet though, but they should be easy.
  3. I forgot to mention I got some A6 handles got them out of a car at the scrappies :D £20
  4. Finally finshed the passenger side carpet, it just needs leather edging where it joins the base of the rear seat panel. New alarm has arrived Toad Ai606 bargin at only £99 brand new, Ordered a few styling bits from DDI, Took bonnet, wings, doors to join my bumpers at the bodyshop, (Eleven 80 Customs) for smoothing and A6 handles.
  5. Thanks for the encouraging words Nick, I hope I can get it all done, I've got a picture of what I want it to look like in my head & it just wont feel right unless its all done. As far as the courage to pull it apart go's , I'm a bit like that with everything, I've got massive Ideas for everything house, garden, cars etc can be a bit of a bad habit :oops:
  6. :D Yesterday I went to dropped my rear bumper off at the plastic welders, but when I got there he had locked up :( , so I left it at the side of his unit and sent him a text telling him that I wanted to delete the exhaust and towing eye holes and plastic fill the lower swage line, I also mentioned that I needed it back ASAP. So Imagine how suprised I was when I phone him this afternoon to ask him if he'd found it, and he tells me its fininhed :shock: :? :D . I still needs a bit of rubbing down but it's near enough ready :D
  7. Daz, as you know Crazy can be good sometimes :D If I get this finished in five weeks, I'l never be able to make any excuses again as to why the Golf G60 project has taken 6 years and it still not done :D :shock: P.S remind Steve to bring my G lader back, I need to get it chromed :wink: DAZ
  8. Hi all, just thought I'd show you lot how I've been getting on with the carpet. I started taking the old carpet out at about 23:00 and have just called it a night 02:00 ish as I've got to be up for work at 6 :sleeping: I manage to seperate the original carpet into 3 parts, Driver, passenger and rear, I then used these parts as templates on the new carpet. After cutting the carpet in the house, I went back out to the car for a trial fitting. I'm not finished yet but so far so good :D .
  9. Now your on my wavelength :D , I've got a good few mates doing all they can to help , so fingers crossed.
  10. Didnt I put that in the list :oops: because so many panels are being tampered with I'l have to repaint it.
  11. Just took a load of engine and gearbox bits down to be polished/chromed/plastic chromed, Heres the list; RS rims 39 bolts (various) 8 door card screws 3 nuts, 10 brackets,(various) German spec 2.9 inlet manifold (upper & lower) throtle body, 2 bonnet hinges, 2 door catches, (and bolts) 3 engine mount brackets, fuel rail, reverse switch, shift weight,
  12. Thanks Bally I know its a mammoth mission But I do like a challenge. "this message will self destruct" :onfire:
  13. good luck with its a big ask. If its a factory carpet, dead easy you won't any problems. If its custom made show quality one like mine it will take days to do even for a pro. I'l see ya in a couple of days then :D
  14. I took my engine to get rebuilt this evening, been told I should have it back within a week ( Big thanks to DAZ fom Dub Shack) :D Also took the RS's apart,which was a nightmare, endless undoing of bolts and then seperating the 3 peices :shock: for a while I was convinced they were glued.
  15. Thanks for all the good luck shout's I know i'm gonna need it :) logicaltunning "the essentials, yes, the carpets, install etc, not a chance lol" Those are the easy bit's, the carpet should take me no longer than a few hours to cut to shape, bond together and fit, and the ice install, (less the wiring, which will be done with the carpets) will proberbly take a full day ti fit. I might start the carpet tomorrow. :)
  16. Firefighter mate so 2 days 7am-6pm ,2 nights 6pm-7am, 4 days off rotating shift. I think I can do it but it will be close. :)
  17. It's gonna be a right mad one to get it finished, but I'm determined to drive to Wothersee in the VR. were setting off on the 21st of May, so thats FIVE WEEKS :shock: what do you think can it be done :?: Things to do: INTERIOR. *stip out old carpet cut and fit new carpet DONE *get dash, interior retrimmed (including audioscape pod & sub box, tunnel cover, and Parcel shelf) *Run wire's for speakers amp and relocated battery *make and weld a metal battery box under rear armrest (sunken into floor) ENGINE BAY *get engine bay cleaned, declutered , *Engine rebuilt (and TT'ed) , refitted, *gearbox painted, some bits chromed *Inlet manifold & Rocker cover polished *Rebiuld gearbox with ATB diff BODYWORK, *fix sunroof *smooth bumpers, (number plate, exhaust,towing eye) *A6 handles, *flush tailgate,(fit solenoid) *MX5 mirrors (wire electric's) *Arches rolled *delete side repeaters, rear wiper,roof ariel, washer jets and rear badges CHASSIS & WHEELS, *Strip and plate and rebuild BBS RS's *Take Coilovers to Avo for a rebuild and new front springs ICE *fit new stereo, sub box, amp, audioscape's, component A few pic's of the state it's in at the momment.
  18. My mate had some in his Jreg G60. DAZ
  19. You'll like the half leather heated electric recaro's for £265 then :D
  20. Thanx mate, I just cant wait to get it finished :D LOL, you would'nt want it at the moment, its got no engine, seats or dash in at the moment :) The door pod are with the rest of the interior at the trimmers. And yes mate a cheap but Very tasty Raddo is what I'm aiming for, I've been collecting bits for a few months and now only have 8 weeks to put it all together so I can drive it to worthersee on 21 May :D I thought it was called Midnight blue pearl but you could be right I'm not to sure, it almost black in some light & a beautiful pearly blue in others I'm going to add a little bit of Violet pearl when it gets painted in a few weeks 8) . The wheels ar ET: 30 Thanx for all the possitive response guys :D DAZ
  21. There Audi fitment 236's DAZ
  22. LOL, thanks for the offer but no way, these will be kept and handed down to my great grand kids :D DAZ
  23. It needed a bit of engine work, which the owner had been over quoted to get done, so he thought he could afford to keep it. I knoked him down from 1300. I've since found receipt in with the paper work for £4500 a year and a half ago. DAZ
×
×
  • Create New...