uktarget 0 Posted July 5, 2007 Going to fit this this afternoon I've just been looking at the standard set-up and it has the feed to the fpr a feed to the rail next to it and then a pipe coming off the other end and going to a sensor. As you can see the bbm rail only has 2 pipes do i need anything else to fit or do i blank off disconnect a pipe/sensor Going to be fitted with a bbm stage 3 chip and red-tops Quote Share this post Link to post Share on other sites
olly elworthy 0 Posted July 5, 2007 i beleive teh sensor screws into teh tapping in teh top of teh BBM rail,, you can see it here.. Quote Share this post Link to post Share on other sites
Blue_Joe 0 Posted July 5, 2007 Going to fit this this afternoon I've just been looking at the standard set-up and it has the feed to the fpr a feed to the rail next to it and then a pipe coming off the other end and going to a sensor. As you can see the bbm rail only has 2 pipes do i need anything else to fit or do i blank off disconnect a pipe/sensor Going to be fitted with a bbm stage 3 chip and red-tops The fuel return goes onto the XRP fitting, then you blank off the sensor! Quote Share this post Link to post Share on other sites
uktarget 0 Posted July 5, 2007 Cheers sam was getting a bit worried :lol: While were here have you got a fitting piece for the induction pipe onto the standard charger Cheers John Quote Share this post Link to post Share on other sites