timg60 0 Posted April 10, 2006 Hi guys, I have finally done 250miles on the rebuilt charger and the boys at http://www.rk-engineering.co.uk have kindly sqeezed me in tommorow to put her on the RR. I have asked them to take out the CC as have been told that after 150thou miles it will be nigh on obsolete and leaves a nice big hole for some induction pipe. Plus tidies up the engine bay. Having never had a car that would benifit from being set up on a RR before what should I be asking / getting done. All the info is in my sig. 8) cheers Tim Quote Share this post Link to post Share on other sites
Walesy 0 Posted April 10, 2006 8) ..I'm booked in there tomorrow aswell Tim, what time are you going down there? I'm heading down in the morning. Quote Share this post Link to post Share on other sites
timg60 0 Posted April 10, 2006 Getting down there for about 9.15. Just got to drop some bits at porthtowan first. Quote Share this post Link to post Share on other sites
Walesy 0 Posted April 10, 2006 :) Cool, i'll see you there for a lungfull of Carbon Monoxide for breakfast then :twisted: Quote Share this post Link to post Share on other sites
Trig 0 Posted April 10, 2006 Tempted to take the morning off work and join you... If I had my C I would but right now i'm forced to drive the yellow 205. Good luck! :) Quote Share this post Link to post Share on other sites
junkie 0 Posted April 10, 2006 They should know what to do and look for. Just sit back and chill. Quote Share this post Link to post Share on other sites